Engineering Contractors (A03)
Not every project needs an engineer – but when you do, you need the right one.
This BidScope clarifies exactly when Utah code requires licensed Professional Engineer involvement versus when it’s optional but wise.
Learn the critical difference between structural engineers (foundation design, load calculations, seismic analysis) and civil engineers (site work, grading, drainage, utilities).
Master the PE licensing verification process through Utah’s E100 database.
Understand what deliverables you should expect – stamped plans, sealed calculations, geotechnical soil reports.
Navigate Utah’s high seismic zone D2 requirements along the Wasatch Fault.
Know when retaining walls require engineering (typically over 4 feet).
Calculate snow loads by elevation for roof design.
Coordinate effectively between engineers, architects, and contractors.
Understand fee structures – hourly rates versus fixed fees versus percentage of construction cost.
This tool ensures you get proper engineering when required and valuable engineering guidance when optional.
What’s Included:
- When engineering is legally required by Utah code versus optional
- PE license verification through Utah E100 database
- Structural engineering services (foundation design, beam sizing, load calculations, seismic design)
- Civil engineering services (site grading, drainage design, utility coordination)
- Geotechnical engineering and soil testing requirements
- Wasatch Fault seismic zone D2 design requirements and calculations
- Snow load calculations by elevation (25-70 PSF based on location)
- Foundation engineering (footings, stem walls, basement walls, soil-bearing capacity)
- Retaining wall engineering requirements (typically required over 4 feet height)
- Beam and header sizing calculations for openings
- Floor joist and rafter span tables and when engineering required
- Stamped plan requirements and submittal process
- Sealed calculation packages and what they include
- Engineer/architect coordination protocols
- Engineer/contractor coordination and RFI procedures
- Plan review process with building departments
- Peer review requirements for complex projects
- Professional Engineer fee structures (hourly vs fixed vs percentage)
- Professional liability insurance (E&O coverage)
- Construction administration services
- As-built documentation requirements
We write rarely, but only the best content.
Please check your email for a confirmation email.
Only once you've confirmed your email will you be subscribed to our newsletter.